Back

Riva Riva 130

$31,436,591 Listed price: €18,950,000

Presented For Sale By:

Camper & Nicholsons - Monaco

7, rue du Gabian
Monte Carlo
Monaco
+ 377 (0)97 97 77 00

View Seller Inventory
 

Contact Seller

X
* We weren't able to post your message, please check the highlighted fields and try again.

Thanks

We have sent your information directly to the seller.

Request cannot be completed

You may have entered incorrect information or the server is temporarily down. Please reload this page and try again later.

Contact Seller

X
* We weren't able to post your message, please check the highlighted fields and try again.

Thanks

We have sent your information directly to the seller.

Request cannot be completed

You may have entered incorrect information or the server is temporarily down. Please reload this page and try again later.

Make Riva
Model Riva 130
Year 2023
Condition Used
Price €18,950,000
Type Power
Class Motor Yacht
Length 40 m
Fuel Type Diesel
Hull Material Fibreglass
Location Ventimiglia, Imperia, Italy
Tax Status Tax Not Paid
LOA 40 m
Beam 7.86 m
Max Draft 2.29 m
Min. Draft 2.29 m
Cabin Headroom 5 m
Gross Tonnage 299 t
Engine Model MTU
Fuel Type Diesel
Power 2638 kW
Engine Location Port
Engine usage (hours) 1100
Engine Model MTU
Fuel Type Diesel
Power 2638 kW
Engine Location Starboard
Engine usage (hours) 1100
Guest Cabins 5
Guest Heads 10
Crew Heads 7
Fuel Tanks 17000 litres
Fresh Water Tanks 3500 litres

Description

LADY FIRST

Machinery

Engines 2 X MTU 2638 HP

Engine model 16V 2000 M96L

Engine hours Port: 1100hrs (19-Feb-2026)

Starboard: 1100hrs (19-Feb-2026)

Fuel Diesel

Propulsion Twin Screw

Gearboxes ZF 5050 A 8° + Top PTO SAE D

Reduction ratio 3.429:1

Steering Electro-hydraulic drive-by-wire

Power pack with 24 Vdc pump and 2 hydraulic cylinders

Emergency steering in Engine Control Room

Stabilizers 2 electro-hydraulic stabilizer fins (underway and zero speed)

2x upgrade gyro stabilizer Seakeeper

Generators Upgrade: 2 x Zenoro 80 kW (instead of 55KW STD)

24 Vdc system

EPA Tier 3 compliant

Generator hours 2200hrs (19-02-2026)

Electricity 400 V 50 Hz 3-phase power

230 V single phase

24 Vdc services and emergency

UPS for data and hi-fi systems

Optional paralleling and SLS system

Shore power 70 kVA isolation transformer

125 A socket

Optional Atlas + PAR shore voltage and frequency converter

Batteries Sealed gel batteries

Separate banks for engines, gensets, emergency, radio, services

24 Vdc system

Air Conditioning Fan coil units

Tropical upgrade with UTA

3 air treatment units

Chilled/heated water piping insulated

Other Machinery Hydraulic bow thruster 110 hp

4 interceptors

Duplex watermaker 250 + 250 l/h upgrade (standard 180 l/h)

Alfa Laval fuel filter

Hamann black water treatment system

Electro-hydraulic shell doors

Electro-hydraulic gangway

Compressed air system

FM200 engine room fire system

Accommodation

Accommodation: 

  • Owner Suite (Main Deck) with dressing, ensuite, study (custom layout)
  • 2 VIP Cabins (Lower Deck) with ensuite bathrooms
  • 2 Guest Cabins (Lower Deck) with ensuite bathrooms including one
  • convertible twin with pullman bed


Custom modification:

  • Upgraded interior finishings throughout the yacht
  • Upgraded master cabin layout
  • Upgraded guest bathroom partitions
  • Upgraded crew dinette layout
  • Dimmer lights in main & upper deck
  • FWD Starboard guest cabin: convertible cabin with pullman
  • Electric curtains throughout guests areas
  • Sole leather to replace standard stone
  • Main deck, upgraded ceilings and furniture
  • Additional table in wheelhouse
  • Additional pilot seat in wheelhouse
  • Master cabin safe
  • Custom parquet floor on the main deck
  • Custom flooring for wheelhouse
  • Additional rosewood frame through the yacht
  • Custom sofas on main & upper deck
  • All interior and exterior lights at 2700K
  • Additional master bed headboard lights
  • All taps, fittings, and decor upgraded

Galley & Laundry equipment

  • Induction 5-burner cooktop
  • Miele oven upgrade
  • Miele induction plate upgrade
  • Dishwasher
  • Fridge + freezer
  • Wine cooler in crew area
  • Gaggenau grill on flybridge
  • Washing machine Miele pro upgrade
  • Washing machine Miele pro additional
  • Dryer machine Miele Pro upgrade
  • Dryer machine Miele Pro upgrade
  • Predisposition for Spotzero purifier

Navigation equipment

  • 4 x 15” LCD monitors
  • 2 x 15” touch monitors
  • Radar 12 kW 72 nm
  • 3 GPS
  • Autopilot
  • Echo sounder
  • Wind station
  • AIS Class A
  • Magnetic compass
  • Searchlight
  • CCTV system
  • Monitoring and AMS

Entertainment equipment

  • Centralized AV system with media server
  • 75” TV in Master
  • 75” TV in Upper Salon
  • 50” TV in VIP cabins
  • 50” TV in Guests cabins
  • 55” TV in Main Deck
  • Apple TV 4K
  • All-in-one AV control via iPad
  • 5G connectivity ready
  • Surround systems in main areas
  • All lighting 2700K with dimmers

Tenders & toys

  • 5.2m (17ft) Williams SportJet 520 w 230hp engine
  • Seadoo jet ski

Deck Equipment

  • 2 x 200 kg anchors
  • 130 m chains (each)
  • 2 electric windlasses 4 kW
  • 2 capstans
  • Retractable cleats (bathing platform)
  • Custom aft gates (and no glass pannels)
  • Sun deck custom bar & furniture
  • Teak decks
  • Jacuzzi foredeck
  • White underwater lights on the side
  • Custom shower beach platform
  • Awning in Foredeck & Sundeck AFT
  • Custom cockpit table
  • Sun deck custom bar & furtnitures
  • Foredeck sunpad with adjustable backrest & forex pannel
  • Custom free standing furniture:
    • 5x chair RBE Riva Aquarama
    • 10x chair Exteta Levante without arms
    • 2x chair Exteta Levante with arms
    • 2x armchair Exteta Bellagio
    • 1x RBE table round-shaped with top in mahogany and maple caulking

Safety & Security Equipment

All safety equipment according to Cayman Island Commercial regulations, including but not limited to:

  • 2 life rafts (10 pax each)
  • 20 life jackets + 2 child
  • Fire extinguishers (foam, powder, CO2)
  • Fireman outfit
  • Fixed fire detection system
  • Emergency lighting
  • Watertight doors with monitoring
  • Side trackways for crew access

Refit History

2026

  • 3 years maintenance (replacement of gaskets, o-rings, bearings, oil and electric motor bearings)
  • Annual service: change of oil and low-/high-pressure filters and general check-up
  • Change of hydraulic hose on arrival pressure to the garage hatch
  • Change of mechanical seals and stator on feed pump and cleaning of water pump
  • Change of oil and filters from both steering pumps
  • Change of oil of both high-pressure pumps
  • Change of oil-pan gaskets
  • Change of pressure switch in Sani-Split from VIP cabins (port and starboard)
  • Epoxy repairs on both black-water tank lids (manhole and sensor lid)
  • Replacement of the second battery
  • Warranty claim on Seakeeper #1 aft for low-pressure break; pistons replaced
  • Yearly maintenance (change of oil, coolant, oil filters, fuel filters and fuel pre-filters)
  • Yearly maintenance including oil filter, fuel pre-filter, fuel separator, CCV filter, zinc-anode change and
  • core heat-exchanger extraction
  • Yearly maintenance of the Seakeepers (new accumulator, oil, coolant and zinc anodes)

 

2025

  • 500-hour maintenance for generators (oil, oil-filter and fuel-filter changes, heat-exchanger cleaning,
  • zinc-anode replacement, air-intake filter and crank-case vent filter service)
  • 500-hour maintenance for both engines (oil, oil-filter and fuel-filter changes, fresh-water cleaning of
  • heat exchangers and gearbox oil change)
  • Air intake filter changed
  • Oil test performed
  • Change of o-rings from turbo charger A-B
  • Change of intermediate o-rings on turbo chargers A & B
  • Change of intermediate o-rings on the middle turbocharger
  • Fuel-oil prefilter changed
  • Engine-battery #2 failure addressed
  • Exhaust-temperature sensor failure on bank B resolved
  • Prefilter fuel-sensor failure repaired
  • Airmar sensor failure corrected
  • Leak of exhaust gas from turbo chargers fixed
  • Prefilter fuel sensor failure repaired
  • Change of mechanical seal of feed pump (water maker #2)
  • Change of mechanical seals of black- and grey-water pumps
  • Change of mechanical seal of garage pump
  • Change of bilge-pump mechanical seal
  • Change of mechanical seal and o-rings on 24 V DC seawater pump
  • Change of mechanical seal and o-rings on Seakeeper pump #2
  • Change of oil in both high-pressure pumps
  • Service battery replaced
  • Change of water-maker #1 high-pressure seals and valves
  • Change of water-maker #1 feed pump
  • Change of low-pressure (LP) filters
  • Replacement of water pump and plastic pipe
  • Change of bearings on garage extractors
  • Change of bearings and rust treatment/painting of engine-room extractors
  • Change of filters on drying machines
  • Replacement of zinc anodes and zincs
  • Replacement of the Sani-Split (twin cabin)
  • Change of Sani-Split pressure sensor on crew cabin and spare unit
  • Replacement of Planus control board in girls’ cabin
  • Change of internal and external seals on the passarelle
  • Replacement of limit switches on the passarelle
  • Change of oil in jetski sliding base
  • Change of oil in garage crane
  • Cleaning rust from jetski-sliding-base distributor
  • Backflush with Barnacle Buster
  • Cleaning of membranes of water-maker #1 (CTR powder 30 min)
  • Cleaning of membranes of water-maker #2 (CTR powder 30 min)
  • UV lightbulb and UV circuit-board replacement
  • Adaptation of a new Seakeeper pump
  • Seawater cooling pump (Seakeeper #1 bow) replaced completely
  • Seakeeper pump #2 o-rings and mechanical seal replaced
  • Seakeeper #1 bow piston leak repaired under warranty
  • 230 V AC seawater-pump failure addressed
  • Mechanical seal and o-rings replaced on 24 V DC seawater pump
  • Heat exchangers cleaned (primary and secondary circuits)
  • Replacement of electric motor and mechanical seal on 230 V AC seawater pump
  • Replacement of mechanical seal, o-rings, bearings and impeller on pumps
  • Shoreline breaker swap (sources changed between shorelines 1 and 2)
  • Shoreline blackouts investigated and alarm set-points requested
  • UPS cooling-fan failure repaired
  • Air-sensor replaced
  • Cleaned phase pump removed for maintenance
  • Emergency steering system refilled with oil
  • Solenoid valve for black-/grey-water washing fixed after being stuck open
  • Washing machines and dryers logged at 2500 hours runtime

 

2024

  • 10 L of oil added
  • 2 L of coolant agent (Coolguard II) added
  • Water-maker #1 high-pressure pump renewed; carbon and micron filters replaced
  • Change of level sensor of the black-water pump

Exclusions

A complete list of exclusions is available upon request. The owner's personal items and decorations are excluded from the sale.

Show More…

Presented For Sale By:

Camper & Nicholsons - Monaco

7, rue du Gabian
Monte Carlo
Monaco
+ 377 (0)97 97 77 00

View Seller Inventory
 

Contact Seller

X
* We weren't able to post your message, please check the highlighted fields and try again.

Thanks

We have sent your information directly to the seller.

Request cannot be completed

You may have entered incorrect information or the server is temporarily down. Please reload this page and try again later.

Presented For Sale By:

Camper & Nicholsons - Monaco

7, rue du Gabian
Monte Carlo
Monaco
+ 377 (0)97 97 77 00

View Seller Inventory
 

Contact Seller

X
* We weren't able to post your message, please check the highlighted fields and try again.

Thanks

We have sent your information directly to the seller.

Request cannot be completed

You may have entered incorrect information or the server is temporarily down. Please reload this page and try again later.

Services

X